Ad-hoc Measurement Campaigns 2010-2017: Installations and Use-Cases
WAMSTER system has been used in several measurement campaigns since 2010, where its quick deployment to distributed locations provided quick insight into system dynamics. This article describes some typical recent installations where WAMSTER was successfully used to gather valuable data.
UAE: Development of the Dynamic Reactive Compensation strategy
20 WAMSTER PMU devices were installed in several locations around UAE, as part of the project for the development of the Dynamic Reactive Compensation.
Seychelles: Assessment project for the development of Renewable Energy Systems
As a part of the World Bank green energy assessment project in Seychelles, three WAMSTER PMU devices were successfully installed by out German client Energynautics GmbH.
UMEME 24/7: Synchrophasor measurements in Kenya
As a part of the UMEME 24/7 project, six STER PMU devices were successfully installed in Kenya for our German client Energynautics GmbH. The devices were installed with ease and are already measuring data, with preliminary analysis showing frequent instabilities and outages in their power grid.
STER PMU devices installed for the CARWAMS synchrophasor research project
As a part of the CARWAMS research project, WAMSTER devices have been installed at several locations inside the Croatian power transmission and distribution grid.
WAMSTER selected as the supporting technology for CARWAMS synchrophasor research
WAMSTER system and STER Portable PMU units will be used for distributed synchrophasor measurements in the CARWAMS (Croatian Academic Research Wide Area Measurement System) synchrophasor research project.